Hydrometallurgical Processing of Gold Ore | SpringerLink
The extraction of gold into solution at the semi-industrial stage of research was 59.16%. The initial gold content in the pelletized charge, calculated from the balance of tests, is 1.82 g/t, in the original ore—1.84 g/t. The gold content in the cyanide cake along the column height is fairly uniform and averages 0.74 g/t.